Click to Watch the Pinnacle Compactor Refurbishment Center in Action!

 

Available for Pinnacle and Most Other Brand Compactors

Upon receipt, each unit is staged and given an initial inspection and evaluation to establish the full scope of work and pricing prior to beginning the refurbishment process.

Unit is prepped and pressure washed

Overall Inspection of condition and structural integrity

Inspection Items:

  • Understructure frame, cross members, hooks, and main rails
  • Steel surfaces and welds
  • Packer floors and walls
  • Ram floor and sides
  • Ram Guides, shoes,
  • Container floor and side walls
  • Access panels, covers, wiper blades
  • Door latches, hinges, and seals
  • Ground wheels, nose rollers, bull noses, brackets, axels, ratchets,etc.

SERVICE LEVEL 1:

  • Minor patch repairs as needed
  • Power Unit – Inspection of unit including diagnostics on operating system and load test – make minor component replacements and repairs – change hydraulic oil & filters – ensure unit is in good, overall running condition
  • Inspect cylinders for leaks and functionality
  • Inspect ram guides and ram tracking
  • Inspect hydraulic hoses / fittings and replace if necessary
  • Inspect / grease wear items such as ground wheel, nose rollers, door seals, etc. and replace as necessary
  • QC, test, and water test to ensure compactor is in good running condition
  • Repaint, apply ANSI Safety Decals, and stage for deployment

Warranty for Service Level 1 = 30 Days

 

SERVICE LEVEL 2:

  • Inspect overall unit and structural integrity – includes patch & major repairs
  • Inspect power unit – run diagnostics on operating system and load test – make minor component replacements and repairs – change hydraulic oil & filters – ensure unit is in good, overall running condition
  • Inspect & replace with “rebuilt” cylinders (if necessary)
  • Install new cylinder mounts & pins
  • Install new cylinder hoses & fittings
  • Inspect ram guides and ram tracking
  • Inspect hydraulic hoses / fittings and replace if necessary
  • Inspect / grease wear items such as ground wheel, nose rollers, door seals, etc. and replace ifnecessary
  • QC, test, and water test to ensure compactor is in good running condition
  • Prep Surfaces and Repaint, apply ANSI Safety Decals, and stage for deployment

Warranty for Service Level 2 = 120 Days

 

SERVICE LEVEL 3:

  • Inspect overall unit and structural integrity – includes patch & major repairs
  • Inspect power unit – run diagnostics on operating system and load test – make minor component replacements and repairs – change hydraulic oil & filters – ensure unit is in good, overall running condition
  • Install / replace with “new” cylinders
  • Install new cylinder mounts & pins
  • Install new cylinder hoses & fittings
  • Inspect ram guides and ram tracking
  • Replace all hydraulic hoses / fittings
  • Replace / grease all wear items such as ground wheels, nose rollers, door seals, etc.
  • QC, test, and water test to ensure compactor is in good running condition
  • Prep Surfaces and Repaint, apply ANSI Safety Decals, and stage for deployment

Warranty for Service Level 3 = 1 Year (12 months)

*All Levels include power unit testing, light refurbishment, and part replacements– if power unit is
deemed cost prohibitive to refurbish, a new power unit will be recommended and priced separately